Exceptional Installations

A curated showcase of precision engineering and uncompromising craftsmanship

Mall Rooftop Unit Replacement
Installation
5 photos

Mall Rooftop Unit Replacement

Located in Bronx, NY, TA changed several rooftop units and removed some unused machinery that was on the roof. The work was intense and the schedule was tight, but we pulled it off as usual. The complex part of the project was the removal of a 44,000# building generator system that tested the strength of the crane as well as the abilities of the rigging crew from LFG rigging.

Bronx, NY
September 2025
Whole Foods 50th Street
Installation
3 photos

Whole Foods 50th Street

A fast paced installation indeed. Ever wonder what you could do in 10 weeks? Well, this is the proof that it CAN be done.

March 2025
Dolce & Gabbana Flagship Store
Installation
7 photos

Dolce & Gabbana Flagship Store

TA Mechanical got the go ahead to install the systems for the new Dolce & Gabbana Flagship location on Madison Avenue.

Madison Ave, NYC
February 2024
Greywind Restaurant
Installation
8 photos

Greywind Restaurant

A jewel in the Related crown is the exceptional Greywind Restaurant at 451 10th Avenue. Completed over the winter of 2023/24, this restaurant presented almost too many challenges, but we pulled it off professionally. This restaurant has a combination of VRF units and WSHP systems in conjunction with a conditioned makeup air system coupled to two electro static precipitators. A very complex system indeed!

January 2024
Valentino Flagship Store
Installation
7 photos

Valentino Flagship Store

TA Mechanical installed all indoor comfort systems at the new Flagship location for this world renowned clothing company.

January 2024
Ci Siamo Restaurant
Installation
5 photos

Ci Siamo Restaurant

Located in luxurious Manhattan West, Ci Siamo has turned a LOT of heads in the NYC culinary circle. This two story restaurant offers unique Italian dishes that are sure to please the palate. This project was extremely complicated with 5 separate PCU systems, Makeup air systems, Water Source Heat Pumps and Kitchen exhaust systems. Restaurants are always difficult, but the finished product is always the reward.

June 2023
Exclusive Luxury Apartment
Installation

Exclusive Luxury Apartment

We can't talk about this one too much considering the location and the owner, but suffice to say, one of the most beautiful apartments we have ever set foot in. A truly amazing work of art for a very appreciative client.

July 2022
Ultra Luxury Multi-Story Residential Apartment
Installation

Ultra Luxury Multi-Story Residential Apartment

Three Story Luxury residential apartment including roof deck. Complete renovation with cutting edge VRF equipment and state of the art ventilation and humidity control.

February 2022
Geothermal System with Advanced Boilers
Installation
2 photos

Geothermal System with Advanced Boilers

Prestigious Long Island Golf Club hired TA Mechanical to provide a turnkey design/build solution that included the installation of 23 Geothermal systems with ultra high efficiency boilers to serve as heat injection for the winter months as a backup to the Geothermal system.

Long Island, NY
January 2022
Bryant Park - Cooling Tower
Installation
5 photos

Bryant Park - Cooling Tower

An extremely challenging project indeed. Due to the time of the year, a permit for rigging was out of the question. The existing tower had to be broken down to the smallest components possible and taken down through the building. The new tower had to be built in place in the opposite direction as the old tower was removed. New riser piping was installed for 17 floors and new pumps were installed in the cellar in conjunction to a new BMS system.

October 2021
Fitness Club New Installation
Installation
5 photos

Fitness Club New Installation

TA has completed over 50 fitness club installations ranging from discount health clubs to ultra exclusive concierge fitness locations. This particular installation was challenging for its indoor clearance and outdoor access for equipment location.

December 2019
Building Master Modernization Plan
Installation
4 photos

Building Master Modernization Plan

TA was hired to plan the staged removal of city steam, cooling towers, pumps, boilers and all of the associated systems. New VRF systems were selected and due to the limited setback room for condensers, an innovative steel balcony system was used every 6 floors in which to house the condensing units. Over 300 Square Feet per floor was given back to the landlord for use on each floor as the mechanical rooms were removed.

November 2018
Frogs Pond Luxury Modern Home
Installation
5 photos

Frogs Pond Luxury Modern Home

A truly unique home designed with the vision of a very exclusive east end Long Island Architect. This home uses unique geometric confusion to create a truly unique experience. TA participated in the design and pre-construction of all systems inclusive of multiple ultra high efficiency boilers, radiant floors, geothermal heating and cooling systems and energy recovery ventilation

E. Hampton, NY
July 2017
The ARC House
Installation
4 photos

The ARC House

This award winning design by Maziar Behrooz was perhaps the most difficult installation in TA history. Part of this house was underground, part of it was above ground and constructed of structural SIP panels with no hidden spaced for the installation of mechanical systems and part of the space was open an open format arch that made installation of ductwork impossible. The fact that you cannot see any evidence of mechanical systems is a testament to the cooperation between designer, builder and TA Mechanical.

Wainscot, NY
August 2015

Ready for Excellence?

Let's discuss your vision for the perfect climate solution

TA Mechanical Group
TA Mechanical Group
Premium Climate Solutions

Delivering unparalleled excellence in climate control solutions for discerning residential and commercial clients. Where precision engineering meets uncompromising quality.

© 2026 TA Mechanical Group, Inc. All rights reserved.

Licensed, Bonded & Insured | Manufacturer Certified Technicians